Understanding Gateway 2 and Its Impact on Your Project

Gateway 2 is a critical checkpoint in The Building Safety Act compliance process, ensuring that all design elements meet stringent regulatory standards before construction begins. While achieving approval is a priority, many construction teams underestimate the hidden costs associated with Gateway 2 rejection. Failing to meet compliance can lead to significant financial losses, project delays and legal risks. 

This blog explores the true cost of non-compliance and how construction teams can avoid the pitfalls of rejection.

1. The Financial Impact of Gateway 2 Rejections

A rejected Gateway 2 submission is more than just a regulatory setback—it’s a direct hit to your project's budget and timeline. Some of the key financial consequences include:

  • Project Delays: A rejection can lead to costly stoppages, delaying construction progress, increasing labour costs, and sometimes the loss of investor funding
  • Redesign Costs: Revising non-compliant designs can be expensive, requiring additional fees for architects, engineers, and consultants.
  • Legal Risks: Non-compliance may result in fines, contractual disputes, or even legal action from regulatory bodies or stakeholders.

 

Avoiding Financial Pitfalls

  • When it comes to substructure protection design, ensure your submission aligns with BS 8102:2022 (Waterproofing), BS 8485:2015+A1:2019 (Gas Protection), and NHBC 4.2 (Ground Heave).
  • Work with CSSW-certified designers to ensure your plans meet compliance standards from the outset.
  • Utilize digital tools like Premcrete’s Premtrac portal to track compliance progress in real time.

2. The Cost of Inconsistent Documentation and Lack of Design Accountability

One of the most common reasons for Gateway 2 rejection is incomplete or inconsistent documentation. Construction teams often face:

  • Additional Expenses: Re-submissions require extra admin time, consultant fees, and may delay funding approvals.
  • Design Accountability Issues: When multiple suppliers handle different aspects of a project, inconsistencies can arise, leading to gaps in compliance and liability risks.

Solutions for Improved Documentation

  • Implement structured quality control and ensure all compliance documents are completed before submission.
  • Work with a single-source provider like Premcrete for waterproofing and gas protection to simplify design accountability and compliance tracking.
  • Use a centralized document management system (e.g., Premtrac), reducing miscommunication and submission errors.
3. The Value of Single-Source Warranties and Design Liability Coverage

Gateway 2 rejection often highlights a critical issue: a lack of integrated design coverage. Working with multiple suppliers increases the risk of conflicting specifications, resulting in compliance failures.

Benefits of Single-Source Warranties

  • Comprehensive Coverage: A 25-year single-source warranty ensures all elements of waterproofing and gas protection are covered under one agreement.
  • Reduced Risk of Unexpected Costs: A single-source approach eliminates the blame game between multiple suppliers, ensuring liability is clear and managed effectively, avoiding a ‘patchwork’ of warranties.
  • Design Liability Protection: Premcrete offers £10 million Professional Indemnity insurance, safeguarding projects against costly design errors and omissions.

pledge graphic

4. How Premcrete’s In-House Design Support Safeguards Against Costly Rejections

Premcrete’s expert technical team provides proactive compliance support for Gateway 2 submissions. By working with Premcrete, construction teams benefit from:

  • Pre-compliance checks, identifying potential issues before submission.
  • In-house design expertise, ensuring BS 8102:2022, BS 8485:2015+A1:2019, and NHBC 4.2 standards are met.
  • Seamless quality control through the Premtrac portal, eliminating documentation errors.

Avoid the Hidden Costs of Gateway 2 Rejection

Gateway 2 rejection is more than a compliance issue—it’s a costly disruption that can derail construction projects. By taking proactive measures, construction teams can avoid unnecessary expenses, legal risks, and project delays.

Take Action:

Is your project truly Gateway 2 compliant? Download Premcrete’s Gateway 2 Compliance Guide today and speak with our technical team for expert guidance on securing approval.