The Big Question Every Project Team Asks
When waterproofing below-ground structures, one choice keeps coming up:
- Pre-applied membranes (installed before the pour)
- Post-applied membranes (installed after the concrete cures)
On paper, both protect structures. But in reality? The decision has huge implications for cost, programme, and long-term reliability.
Here’s a breakdown of how each approach impacts your bottom line.
Material Cost vs Hidden Cost
- Pre-applied systems (e.g. MAXIPRUFE PLUS, COMBI-SEAL): Higher upfront £/m². But often include built-in protection, reducing the need for primers or secondary treatments.
- Post-applied systems (e.g. HYDROPRUFE 3000/8000, liquids): Lower headline cost. But add in primers, multiple coats, surface prep… the "cheap option" isn’t always cheap.
Labour & Programme Impact
- Pre-applied: Needs careful sequencing with reinforcement + shuttering. But eliminates substrate prep entirely. Integrates naturally with pour sequence.
- Post-applied: Appears simpler, but requires surface cleaning, repairs, and prep. Adds more labour hours and extends programme duration.
Weather Dependency
- Pre-applied: Less exposed. Provides early-stage resilience and isn’t as weather-dependent.
- Post-applied: Highly sensitive to rain, moisture, or cold. Installation delays are common and may even require climate control.
Quality & Long-Term Risk
- Pre-applied: Bonds directly to fresh concrete, blocking lateral water migration. Reliable long-term.
- Post-applied: Depends heavily on substrate prep. Any imperfection = adhesion risk = potential failure.
When to Choose Each
- Pre-applied membranes → Best for new builds with clear sequencing, controlled conditions, and long-term performance focus.
- Post-applied membranes → Better for remedial works, irregular geometries, or phased builds with staggered access.
Whole-Life Cost Consideration
When weighing options, don’t stop at material price. Consider:
- Material + primers
- Labour hours
- Programme delays
- Rework + inspection risk
In many cases, pre-applied systems deliver better whole-life value, even with higher initial cost.
Protecting Complex Structures with Smarter Choices
Choosing between pre- and post-applied membranes isn’t just about today’s material price. It’s about whole-life project value: cost certainty, programme certainty, and long-term performance.
At Premcrete, we help contractors cut through the noise and pick the right system for their specific site conditions.